★★★★★ Rated 5.0 on Google · Family owned since 2003
Niagara additions
More room in Niagara, without moving
We design and build additions across Niagara, from St. Catharines to Beamsville: rear and side extensions, second storeys, bigger kitchens and new family rooms. Our team handles the drawings, the structural engineer, the your local municipality permit and every trade. Most additions we build cost $120,000 to $350,000+See price before HST.
Footings, foundation walls and waterproofing, inspected before anything is closed in.
02
Framing
Walls, floor and roof framed to the engineer's drawings.
03
Exterior
Siding, windows and a new deck with stairs to the yard.
04
Finished
A bright, open living space with new floors and pot lights.
Gallery
Home addition projects near Niagara
Home additions across Niagara
Additions we build
Where we work in and around Niagara
St. Catharines, Niagara Falls, Niagara-on-the-Lake, Welland, Lincoln and Beamsville, and the rest of Niagara.
The homes
Niagara’s homes range from century homes in St. Catharines and Niagara-on-the-Lake to post-war bungalows and newer subdivisions in Niagara Falls, Welland and Lincoln.
Home addition permits in Niagara
Every addition needs a building permit from your local municipality. We prepare the architectural drawings, the engineer’s design and the application, and book every inspection.
Frequently Asked Questions
Niagara home addition questions
How much does a home addition cost in Niagara?
Most additions we build cost $120,000 to $350,000+See price before HST, depending on size, structure and finishes. You get a fixed quote after design.
Do you build additions in Niagara?
Yes. We work across Niagara, including St. Catharines, Niagara Falls, Niagara-on-the-Lake, Welland, Lincoln and Beamsville, from our Burlington office.
Do you handle the permit?
Yes. We prepare the architectural drawings, bring in the structural engineer and handle the permit and inspections with your local municipality.
How long does an addition take?
Design and permits usually take 2 to 3 months, and construction 3 to 6 months, depending on size.
Can we live at home during the work?
Usually, yes. Most of the work happens outside your existing walls until we connect the new space.