Customers Rate us 5 out of 5

Costs & Budgeting

How to Finance a Home Renovation in Ontario: HELOC vs Cash

HELOC, refinance, personal loan, payment plan or cash: how each works in Ontario, what it costs at current rates, and which one fits your project size.

A home renovated by Gracia Makeovers

Most Ontario homeowners pay for a renovation with savings, a home equity line of credit (HELOC), a mortgage refinance, or a mix of these. Our rule of thumb: use cash under $50,000, use a HELOC drawn at each payment milestone from $50,000 to $150,000, and use a refinance timed to your mortgage renewal over $150,000. Personal loans and payment plans cost more, so they only make sense for small jobs or homes with little equity.

  • A standalone HELOC can go up to 65% of your home's value. All borrowing secured by the home usually tops out at 80% combined.
  • Big-bank prime is 4.70% since October 29, 2026. A HELOC priced at prime plus 0.50% costs 5.20%, and the rate moves every time the Bank of Canada does.
  • A HELOC only charges interest on what you've drawn. Drawing at each milestone instead of all at once saves real money.
  • Ontario law has you hold back 10% of each payment, so you never need the full contract price on day one.
  • Adding a legal secondary suite can qualify you for an insured refinance up to 90% of the home's value.

The five ways to pay, side by side

Each option suits a different situation. Here is how they compare.

OptionHow the money arrivesRate basisBest forWatch out for
Cash / savingsAlready in handNo interest, but you give up what the savings would have earnedProjects under $50K, depositsDraining your emergency fund
HELOCDraw any amount, any time, up to your limitVariable, priced off prime$50K to $150K, staged paymentsRate increases, interest-only habits
Mortgage refinanceLump sum at closingFixed or variable mortgage rateOver $150K, additions, whole-homePrepayment penalty mid-term, legal and appraisal fees
Personal loan / unsecured lineLump sum or lineHigher than secured borrowingSmall jobs, little home equityCost adds up on bigger amounts
Contractor or retailer payment planA third-party lender pays the contractorPromo rate, then the standard rateSingle items, short paybackThe rate after the promo ends

How much you can borrow: the 65% and 80% rules

The Financial Consumer Agency of Canada sets out the limits federally regulated lenders follow. A HELOC can go up to 65% of your home's appraised value. All home equity borrowing combined, mortgage included, usually tops out at 80%. When a HELOC is bundled with a mortgage, anything above the 65% revolving portion has to be paid down on a schedule, like a regular mortgage.

A quick example. Your home appraises at $1,200,000 and you owe $500,000. Eighty percent of the value is $960,000, so you have about $460,000 of room before the lender checks your income and runs the stress test. If the house is paid off, a standalone HELOC caps at 65%, or $780,000 on that home.

Most people never get close to these limits on a kitchen or bathroom. The limits start to matter on additions and whole-home projects, and for owners who bought recently with a small down payment.

What it costs at today's rates

On October 28, 2026, the Bank of Canada raised its policy rate to 2.5%, and said further increases may be needed. It was the first hike since July 2023. All six of the big banks moved prime to 4.70% right after. The next rate decision is December 9, 2026, so anyone planning a 2027 project on a variable line should budget for another move.

If your bank prices your HELOC at prime plus 0.50%, you pay 5.20%. Interest-only on $100,000 at that rate is about $433 a month. Each 0.25% increase adds about $21 a month per $100,000 borrowed. That's manageable, but a variable rate needs some room in your budget.

Why draw timing matters

A HELOC only charges interest on the balance you've drawn. Here is a $100,000 project over four months at 5.20%:

ApproachBalance during the projectInterest over 4 months
Draw everything on day one$100K every monthAbout $1,733
Draw at each milestone$25K, $50K, $75K, $90K (10% held back)About $1,040

A refinance gives you the full lump sum at closing, so you pay interest on all of it from day one. On a short project the gap is small. On a nine-month addition it grows.

Matching your financing to the contractor's payment schedule

Renovation contracts are paid in stages, not all at once. A typical schedule looks like this:

  1. A deposit at signing, which covers design time, permit drawings and long-lead orders like cabinetry.
  2. Progress payments at milestones such as demolition and rough-ins, passed inspections, drywall, and cabinet or tile install.
  3. A final payment at substantial completion.
  4. Release of the holdback once the lien period has passed.

Under Ontario's Construction Act, homeowners must hold back 10% of each payment as the work is done, which protects you if a subcontractor or supplier goes unpaid. The holdback stays in place until the lien period ends, which is generally 60 days from completion or from publication of a certificate of substantial performance. In practice, you don't need the last 10% of your financing until about two months after the work wraps up.

We'd pay the deposit from cash and draw each later payment from the HELOC when the invoice arrives. If you're refinancing, close before demolition so no payment is waiting on the bank.

Our recommendation by project size

Project sizeTypical Gracia projects (before HST)What we'd use
Under $50KPowder room $7K to $20K, main bath $28K to $40K, smaller basements from $25KCash first, HELOC second
$50K to $150KKitchens $40K to $140K+, ensuites $35K to $55K, basements up to $100K+HELOC drawn per milestone, cash deposit
Over $150KAdditions $120K to $350K+, whole-home $100K to $250K+Refinance at renewal, or a HELOC rolled into the refinance

Under $50,000

If the money is in savings and you'll still have an emergency fund afterward, pay cash. Setting up a HELOC for a $20,000 powder room means an appraisal and paperwork to save very little interest. If you need to borrow, a HELOC still beats a personal loan on rate. Use a personal loan or a payment plan only if you have little equity, and work out the full cost after any promo period ends.

$50,000 to $150,000

This is where a HELOC works best. Most kitchen renovations and finished basements land in this range. Don't forget HST. An $80,000 kitchen before tax is $90,400 with 13% HST. Set up the line before you sign, not after demolition. Then pick a payoff plan, say 24 to 36 months, so the balance doesn't sit for years on interest-only payments.

Over $150,000

Additions and major whole-home renovations are where a refinance usually pays off. Interest-only on $250,000 at 5.20% is about $1,083 a month with no principal coming off. A refinance spreads the principal over your amortization. Time it to your renewal if you can, because breaking a mortgage mid-term can cost a large penalty. If renewal is a year away, many owners start on a HELOC and roll the balance into the new mortgage at renewal.

A standard refinance stops at 80%. If you're building a self-contained secondary suite, CMHC Refinance allows insured borrowing up to 90% of the home's value once the suite is built. The as-improved value has to be under $2 million, amortization can run up to 30 years, the property can have up to four units, and the suite can't be rented short-term. A mortgage insurance premium applies. The money has to go toward building the suite, so this works for legal basement apartments, not a general kitchen update.

What we see on site

  • Financing approved late. Appraisals and approvals take time. Get approval in writing before you sign the contract, so a delay at the bank doesn't hold up the trades.
  • Maxing out the line. We open walls and find rot, old wiring or a cast iron drain that needs replacing. We'd leave about 10% of the project value unused on the line as a contingency.
  • Forgetting HST. Quotes and price ranges are often shown before tax. Borrow for the after-tax total.
  • Mixing up holdback and deficiencies. The 10% holdback is a legal protection, not a fund for touch-ups. Keep deficiency items on a separate written list.
  • Changes mid-project. Upgrading to a bigger island or different tile halfway through adds cost. Settle the scope before you finance, and get changes priced in writing before you agree to them.
  • Planning around the minimum payment. A HELOC lets you pay interest only. Treat it as a short-term loan with a payoff date.

Your next step

Your financing is only as good as your budget, so start with scope and price, then talk to your lender. Our pages on home renovations in Oakville and home renovations in Burlington show what projects there involve. If an addition is on the table, our home additions page explains what drives the cost, so you walk into the bank with a number you can rely on.

Frequently asked questions

Is a HELOC or a personal loan better for a renovation in Ontario?

For most homeowners with equity, a HELOC is better. Your home secures it, so the rate is usually well below an unsecured personal loan, and you only pay interest on what you draw. A personal loan makes sense when you have little equity, the project is small, or you want a fixed payoff date without putting your house up as security.

Can I refinance my mortgage to pay for a renovation?

Yes. A standard refinance lets you borrow up to 80% of your home's appraised value, minus what you owe, as long as you qualify on income and pass the stress test. It works best for large projects like additions. If you'd be refinancing before your term ends, ask your lender for the exact prepayment penalty first, because it can wipe out the savings.

How much equity do I need for a HELOC in Canada?

A standalone HELOC needs at least 35% equity, because the revolving line can't go above 65% of your home's value. A HELOC combined with a mortgage needs at least 20% equity, since total secured borrowing is usually capped at 80%. Your lender will also look at your income, debts and credit history before approving a limit.

Do I have to pay my renovation contractor everything upfront?

No. Renovations are paid in stages: a deposit, then progress payments at milestones such as rough-ins, drywall and finishing. Ontario's Construction Act requires homeowners to hold back 10% of each payment until the lien period passes. Be cautious with any contractor who asks for most of the contract price before work starts.

What is the CMHC 90% refinance for secondary suites?

It's an insured mortgage refinance for owner-occupied homes adding a self-contained secondary suite. You can borrow up to 90% of the home's value after the suite is built, as long as the as-improved value is under $2 million, with up to a 30-year amortization. The money has to go toward building the suite, short-term rentals aren't allowed, and a mortgage insurance premium applies.

Share

Sources

  1. FCAC: Borrowing against home equity canada.ca
  2. Bank of Canada: Bank of Canada raises the policy rate by 25 basis points to 2½% bankofcanada.ca
  3. Money.ca: Bank of Canada raises interest rate to 2.5% in first hike since 2023 money.ca
  4. nesto: Bank of Canada Policy Interest Rate Schedule 2026 nesto.ca
  5. CMHC: CMHC Refinance for Building Secondary Suites cmhc-schl.gc.ca
  6. Nihang Law: Ontario Construction Act Changes 2026, Homeowner Guide nihanglaw.ca
  7. Treadstone Law: The Construction Act Holdback in Ontario treadstonelaw.ca
How to Finance a Home Renovation in Ontario: HELOC vs Cash, Gracia Makeovers project photo

Free consultation

Planning a renovation?

One team handles design, permits and every trade, with a fixed quote that lists every finish. Tell us about your project.

Renovations by town

Gracia Makeovers designs and builds kitchens, bathrooms, basements, additions and whole-home renovations, and rebuilds after water and fire damage, from offices in Oakville and Burlington.

Also serving MiltonMississaugaEtobicokeTorontoAncaster

Ask AI about Gracia Makeovers: ChatGPTPerplexityClaudeGoogle AI Mode  llms.txt