Customers Rate us 5 out of 5

Kitchen cost estimator · 2 minutes

How Much Does a Kitchen Renovation Cost in Burlington?

Most Burlington kitchens we build cost $40,000 to $140,000+. Answer five quick questions below and see your range.

The short answer

What a kitchen costs in Burlington

Most kitchens we renovate in Burlington cost $40,000 to $140,000+ before HST. A small kitchen with thermofoil or acrylic doors sits near the lower end; a large kitchen with solid walnut or white oak, an island and a wall removed sits at the top.

Three things move the price most: the size of the kitchen, the cabinets you choose, and changes to the room itself, like removing a wall or moving the sink.

What you get

What's included in every kitchen

Design
Layout planning, 3D renderings and finish selection with you
Cabinets
Custom built to your measurements, melamine boxes standard, plywood as an upgrade
Hardware
Blum soft-close hinges and drawer slides in every kitchen
Counters
Quartz included, with sink and cooktop cut-outs
Trades
Plumbing, electrical, lighting and installation by one team
Permits
Drawings and City of Burlington permits when walls or plumbing change
Price
A fixed quote, room by room, with an allowance for every finish
Frequently Asked Questions

Still have questions?

How much does a kitchen renovation cost in Burlington?

Most Burlington kitchens we build cost $40,000 to $140,000+ before HST, depending on size, cabinets and changes to the room. Use the estimator on this page for your range.

Keep your layout, choose thermofoil or acrylic doors and quartz counters. Keeping the sink and appliances where they are avoids plumbing and electrical changes.

For most families, yes. An island adds prep space, seating and storage. The cost depends on its size and whether it has a sink or a waterfall edge.

Opening a kitchen to the living area is one of the bigger items in a kitchen, since it includes the engineer, the beam, the permit and finishing the floors and ceiling.

No. It’s a ballpark from kitchens we’ve built. After a free consultation at your home, you get a fixed quote, room by room.

Most kitchens take about 2 weeks from demolition to completion, after roughly 1 week of planning and selections. Larger or structural projects take longer.

Ready for your exact price?

Book a free consultation. We’ll measure, bring samples and give you a fixed quote for your kitchen.