Bathroom Renovation Cost in Ontario, Room by Room (2026)

What each bathroom budget buys in Ontario in 2026, from a $7,000 powder room to a $55,000 ensuite, and how to read the labour, plumbing and permit lines on a quote.

A bathroom renovated by Gracia Makeovers

A bathroom renovation in Ontario costs $7,000 to $20,000 for a powder room, $28,000 to $40,000 for a main bathroom and $35,000 to $55,000 for a primary ensuite in 2026, before HST. Those are our published ranges for the GTA, Hamilton and Niagara. Where you land in each range depends on four things: whether drains move, the glass, a heated floor and how the shower is waterproofed.

  • Each room type has a low end and a high end. Most of the difference is layout and finishes, not square footage.
  • Check that every quote shows 13% HST the same way, so you're comparing like with like.
  • Low allowances for tile and fixtures make a quote look cheap. Ask what they actually cover.
  • Waterproofing, valves and venting are fixed costs. Tile, vanity and glass style are where you can flex.
  • Set aside 10 to 15% for whatever turns up behind the walls.

The three price bands at a glance

These ranges cover the whole job: design, demolition, rough-in plumbing and electrical, waterproofing, tile, fixtures, finishing and cleanup. Ontario's harmonized sales tax is 13%, according to the Canada Revenue Agency's GST/HST rate table. Time on site is what we typically see once demolition starts.

RoomBefore HSTWith 13% HSTTypical time on site
Powder room$7,000 to $20,000$7,910 to $22,6001 to 2 weeks
Main bathroom$28,000 to $40,000$31,640 to $45,2003 to 5 weeks
Primary ensuite$35,000 to $55,000$39,550 to $62,1504 to 6 weeks

Costs are still going up slowly. Statistics Canada reported that residential construction costs across its 15-city composite were up 2.3% year over year in the second quarter of 2026. It also pointed to Canada–U.S. retaliatory tariffs disrupting supply chains. If you're working from a quote you got two years ago, expect today's number to be higher.

Powder room: $7,000 to $20,000

A powder room has a toilet, a sink and no shower, so there's no waterproofing and very little plumbing. Most of the spread comes down to how much of the room you rebuild.

What the low end buys

  • Toilet and sink stay where they are
  • Stock vanity, 24 to 30 inches
  • New porcelain floor tile, paint, baseboard
  • New mirror, light fixture and a quiet exhaust fan

What pushes it toward $20,000

  • A wall-hung toilet with an in-wall carrier, which often means reframing the wall
  • A floating custom vanity or a vessel sink on a stone top
  • Floor-to-ceiling feature tile on one or more walls
  • Sconces or a new lighting layout that needs new wiring and an ESA notification

Our view: a powder room is a good place to be bold with finishes. The room is small, so a $25-per-square-foot tile costs far less in total than it would in an ensuite.

Main bathroom: $28,000 to $40,000

This is the family bathroom, often a 5x8 with a tub along the back wall. Usually it's a full gut down to the studs and subfloor.

Toward the low end

  • Tub stays where it is (new acrylic or enamelled steel tub)
  • Tile to the ceiling around the tub, painted walls elsewhere
  • Pressure-balance valve, stock vanity, standard toilet
  • New fan ducted to the outside

Toward the high end

  • Converting the tub to a walk-in shower with glass
  • Recessed niche, thermostatic valve, handheld on a slide bar
  • Large-format or patterned floor tile, heated floor
  • Replacing old cast-iron or galvanized pipe that turned up during demolition

If this is the only tub in the house, think hard before taking it out. Young families and many buyers still want one bathtub somewhere in the home.

Primary ensuite: $35,000 to $55,000

Ensuites cost more because they're bigger and have more of everything: more tile, more glass and more fixtures. A typical scope is a 60 to 72 inch double vanity, a walk-in shower with frameless glass, a heated floor and sometimes a freestanding tub.

The freestanding tub is where people get caught out. A floor-mounted tub filler means running supply lines up through the floor in the middle of the room, which costs more than a wall-mounted filler. Our ensuite renovation page shows how these layouts usually come together.

Reading the quote: labour, materials, plumbing and permits

Every bathroom quote falls into four buckets. Here is what to look for in each one.

BucketShould includeQuestion to ask
LabourDemolition, framing, board, waterproofing, tile setting, paint, trim, site supervisionIs tile priced by area, and does a pattern like herringbone change the rate?
MaterialsTile, vanity, top, toilet, tub, valve and trim, glass, fan, membrane, lightingAre these named products or allowances? How much is each allowance?
Plumbing and electricalDrains, venting, supply lines, valve rough-in, GFCI circuits, fan and floor-heat wiringWhat happens to the price if we find old cast iron or ungrounded wiring?
PermitsBuilding or plumbing permit if the plumbing changes, ESA notification for electricalWho applies, who books inspections, and is the fee included?

Watch the allowances

A quote that puts $3 a square foot toward tile and $400 toward a vanity will come in lower on paper. It won't stay there once you start picking finishes. Line up the allowances side by side, or ask for named models.

Permits and ESA

Swapping fixtures in the same spots usually doesn't need a building permit. Installing or modifying plumbing does, according to the City of Toronto's permit guidance. Halton, Hamilton and Niagara municipalities all work under the same Ontario Building Code, but fees and timelines differ, so check with your local building department. Electrical work is handled separately. ESA says the person doing the electrical work files the notification, so a Licensed Electrical Contractor files it for you. ESA also requires it to be filed before or within 48 hours of the work starting.

Four upgrades that move the number most

UpgradeWhy it costs moreHow to keep it in check
Moving drainsOpening the floor, re-sloping a 3-inch toilet drain, new venting, sometimes opening the ceiling below or working around joistsKeep the toilet where it is. Move the shower only if the joists run the right way.
Custom glass10 mm frameless panels measured after tile, cut to the opening, with hardware set into blockingUse a fixed panel with no door, or semi-frameless glass at a standard size.
Heated floorMat or cable system, thermostat, a dedicated circuit, room in the panel, testing at every stageHeat only the open floor area, not under the vanity or tub.
Proper waterproofingBonded or liquid membrane systems (Schluter Kerdi, Laticrete Hydro Ban) with matching drains, corners and nichesDon't. This is the one to pay for in full.

Waterproofing is where we won't bend. Tile and grout are not waterproof. The membrane underneath is what keeps water out of the wall, and we flood test the shower pan before any tile goes down. Fixing a leak after five years means tearing out a finished shower, which costs far more than doing the membrane right the first time.

Safe places to flex

These swaps change how the room looks and what it costs, but not how long it lasts:

  • Porcelain instead of marble. It looks close, it's harder and you never have to seal it.
  • Straight lay instead of herringbone. Less cutting means fewer labour hours.
  • Tile where it matters. Full height in the shower, painted walls or wainscot elsewhere.
  • Quality stock vanity instead of custom. Standard widths of 30, 36, 48 and 60 inches cover most rooms.
  • Mid-range trim on a good valve. The valve body sits inside the wall for decades. The handle and showerhead can be upgraded later.

The biggest saving is keeping the layout. Money you don't spend moving drains can go toward a heated floor or better glass instead.

Where projects go wrong

These are the problems we're most often called in to fix, and how we avoid them on our own jobs:

  • Big tile on a bouncy floor. 24x48 porcelain cracks over joists that flex. We check span and add plywood or blocking before setting large-format tile.
  • No blocking behind the drywall. Glass hinges, grab bars, towel warmers and wall-hung vanities need solid wood behind them. Adding it afterwards means cutting into finished walls.
  • Glass measured too early. We template after grout. That's why glass is often the last thing installed, and it can take a few weeks to arrive.
  • Fans venting into the attic. We find this all the time. It causes frost and mould on the roof deck. Every fan we install goes to an exterior hood through insulated duct.
  • Niches in exterior walls. A niche there cuts into the insulation and invites condensation. We keep niches on interior walls and size them to the tile.
  • Finishes changed after demolition. Switching tile mid-job stalls the trades and can change the waterproofing details. Lock your selections before the first hammer swings.

GTA, Hamilton and Niagara: what changes locally

Our ranges are the same across the region. The house matters more than the city it's in. In older Toronto, Etobicoke and lower-city Hamilton homes we more often find plaster, cast-iron stacks and out-of-square rooms, which push a job higher within its range. Newer Halton subdivisions usually open up cleanly, but their builder ensuites are big, so tile and glass quantities go up. For local detail, see our Burlington bathroom cost guide, our Oakville bathroom renovation and Burlington bathroom renovation pages, or our Niagara bathroom renovation page.

The quickest way to put your own room into one of these bands is the cost estimator on our bathroom renovation page. Enter the size, whether the layout changes and the finishes you're leaning toward. You'll get a working number before you talk to anyone.

Frequently asked questions

What is the cheapest way to renovate a bathroom in Ontario?

Keep every fixture where it is. Leaving the toilet, sink and tub or shower in place avoids opening floors and usually means no building permit. After that, pick porcelain tile laid straight, a standard-width stock vanity and a fixed glass panel instead of a hinged door. Don't cut back on the shower membrane or the exhaust fan. Those are cheap to do right during the renovation and expensive to fix later.

How much does it cost to convert a tub to a walk-in shower in Ontario?

In a main bathroom, a tub-to-shower conversion usually puts the job toward the upper half of our $28,000 to $40,000 range before HST. Keeping the drain close to where the tub drain was helps. A curbless entry, a linear drain or frameless glass pushes the cost up. The extra cost comes from the shower pan, the full waterproofing system and custom glass.

Should I budget extra for an older home's bathroom?

Yes. In homes built before about 1960 we often find cast-iron drains, galvanized supply pipe, ungrounded wiring or rotted subfloor around the toilet once the walls are open. We suggest a 10 to 15% contingency in general and the higher end of that for older homes. If nothing turns up, the money stays in your pocket.

Who pulls the permit for a bathroom renovation?

Usually your contractor applies for the building or plumbing permit and books the inspections, but confirm this in writing before you sign. Electrical is separate. In Ontario, the person doing the electrical work files the ESA notification. If you hire a Licensed Electrical Contractor, they file it. A permit and an ESA notification are two different things, and a bathroom with new plumbing and wiring often needs both.

Is it cheaper to renovate two bathrooms at once?

Often a little, per bathroom. Trades are already on site, tile and fixtures can be ordered together, and setup and disposal are shared. The trade-off is going longer without a working bathroom. In houses with two or more bathrooms, we usually stagger the work so one stays in use while the other is being finished.

Share

Sources

  1. Statistics Canada: Building construction price indexes, second quarter 2026 www150.statcan.gc.ca
  2. Canada Revenue Agency: GST/HST rates by province canada.ca
  3. City of Toronto: When Do I Need a Building Permit? toronto.ca
  4. Electrical Safety Authority: How do I notify ESA about electrical work? esasafe.com
  5. Electrical Safety Authority: Property Owner and Manager Obligations esasafe.com
Bathroom Renovation Cost in Ontario, Room by Room (2026), Gracia Makeovers project photo

Bathroom cost estimator

What would your bathroom cost?

Pick the room, the shower and the finishes, and see a rough range in under two minutes. A fixed quote follows a free site visit.

Renovations by town

Gracia Makeovers designs and builds kitchens, bathrooms, basements, additions and whole-home renovations from offices in Oakville and Burlington.