A Burlington bungalow can grow up, back or both. You can add a full or partial second storey if an engineer confirms the footings can carry it, or build a rear family room or main-floor primary suite and keep everything on one level. Our home additions usually run $120,000 to $350,000+ before HST, and the route you pick decides where you land in that range.
- Going up gives you the most space without using more of the lot. Your foundation and roof decide whether it makes sense.
- A partial second storey or a rear addition suits families who need one or two more rooms, not a whole new floor.
- A rear primary suite suits owners who plan to stay and want to live on one level.
- Burlington's new Residential Zoning By-law 09-2026 took effect March 2, 2026. Confirm which by-law covers your lot before design starts.
- You need a Zoning Clearance Certificate before you can apply for the building permit.
The four options side by side
Burlington has a lot of 1950s and 60s bungalows on good-sized lots, so you have choices. This table compares the four ideas before we go through each one.
| Option | What you get | Structural work | Main zoning checks | Who it suits |
|---|---|---|---|---|
| Full second storey | 3 or 4 bedrooms and 2 baths upstairs, with the main floor reworked as living space | Engineer review of footings and foundation walls, new floor system, new roof, stair cut through the main floor | Height, side yards, built-form rules | Families who love the street and need about twice the space |
| Partial second storey | 1 or 2 rooms plus a bath over part of the house | A load path down to the footings under that section only, plus a roof tie-in | Height, side yards | Owners who need a primary suite or kids' rooms and want to keep part of the original roof |
| Rear family room | Open family room, often with the kitchen opened into it | New foundation (basement, crawlspace or piles) and a beam where the rear wall comes out | Rear yard setback, lot coverage | Households short on gathering space, not bedrooms |
| Rear primary suite | Bedroom, ensuite and walk-in closet on the main floor | Same as a family room, plus new drains tied into the existing plumbing | Rear yard setback, lot coverage | Owners planning to age in place |
On cost, rear additions usually fall in the lower half of our home additions range. Full second storeys sit at the top and often go past it, because you're building a new floor and a new roof on an old base.
Idea 1: A full second storey
This one gives you the most space. The usual layout puts bedrooms and bathrooms upstairs, which frees the main floor for a bigger kitchen, a dining area and a family room.
What the structure needs
- Check the footings first. Many bungalows from this era sit on footings sized for one storey. An engineer will often ask for a test pit to see the real footing size before designing anything. If they come up short, the fix can be underpinning or new interior footings and posts.
- A new floor system. The old ceiling joists are usually 2x4 or 2x6. They were built to hold up drywall, not people. Expect new engineered joists, often with a beam replacing the central bearing wall.
- A stair. A straight stair takes a strip of the main floor about 1 metre wide and around 3 to 4 metres long, plus landings. Decide where it goes before anything else.
- Mechanical and electrical. A second floor usually means a new heat-loss calculation, a larger or zoned furnace, and often an upgrade from 100-amp to 200-amp service.
Who it suits
Families who want to stay in the neighbourhood, have outgrown three small bedrooms, and can move out for part of the build. You can't live in the house while the roof is off. We schedule the tear-off for a dry stretch and close in the new floor as fast as we can.
Idea 2: A partial second storey
You build over only part of the footprint, usually the bedroom wing or the end of the house with the best footings. A common result is a primary bedroom, ensuite and closet upstairs, while the kids keep the main-floor bedrooms.
The engineering is the same as a full storey, just over a smaller area. The roof is the hard part. Where the new wall meets the old roof you get valleys and step flashing, and if those aren't detailed properly they leak. You keep more of the original house, and sometimes the family can keep living in the other half.
We'd pick this when the budget is in the middle of the range and the family needs two rooms, not four. It also leaves the backyard alone.
Idea 3: A rear family room
This is the classic bungalow addition. You push the back wall out and open the kitchen into a bright family room with big windows facing the yard.
Foundation choices
| Foundation | Pros | Watch for |
|---|---|---|
| Full basement extension | Adds lower-level space and connects to the existing basement | Most digging, and the most soil to truck away |
| Crawlspace | Less digging and lower cost | Insulation and air sealing have to be done right, or the floor will be cold |
| Helical piles | Good for tight access and near protected trees | Floor insulation and skirting details matter |
Whichever you choose, the footings have to go below frost depth, which here means about 1.2 metres down. The other key piece is the beam that replaces the old rear wall. A flush beam hidden in the ceiling looks best, but it has to be sized and planned at the design stage.
This option suits households that have enough bedrooms but nowhere to gather. It pairs well with a kitchen renovation done at the same time, since that wall is already coming down.
Idea 4: A primary suite at the back
Owners who plan to stay for twenty years ask us for this addition more than any other: a main-floor primary bedroom with an ensuite and a walk-in closet. There are no stairs to the bedroom, and the old bedrooms become guest rooms or an office.
- Plumbing first. The ensuite drain has to slope to the existing stack or the building drain. Check how deep the sewer is before you lock in the layout.
- Curbless shower. New construction is the easiest time to recess the subfloor for a zero-threshold shower. Our walk-in shower work uses the same approach.
- Ensuite scope. For reference, an ensuite in an existing house runs $35,000 to $55,000 before HST, as listed on our ensuite renovation page. In an addition, those finishes come out of the overall addition budget.
Both: up and back together
Some lots and some families justify doing both, with bedrooms upstairs and a rear family room below. Doing it as one project means one design, one permit process and one round of disruption. It's also the right time to think about the basement. The City said its new by-law would bring more options for Additional Residential Units. If you're thinking about a rental suite, it's cheaper to size the electrical service, separate the HVAC and plan fire separations now. Our page on legal basement apartments in Burlington explains what that takes.
Burlington zoning and permits, step by step
Burlington currently has two zoning by-laws in effect: By-law 09-2026 and By-law 2020. Council passed By-law 09-2026 on March 2, 2026, and it replaced the older rules for certain residential lands. So the first job is finding out which one covers your lot. Here's the order we work in:
- Confirm the zone and the by-law. Setbacks, height and lot coverage set the limits for everything else.
- Check Conservation Halton mapping. Conservation Halton regulates watercourses, valleylands, wetlands and the Lake Ontario and Burlington Bay shoreline, and you need its permission to build in those areas. On Niagara Escarpment lands, Conservation Halton can't issue its permit until the NEC has issued one.
- Survey the trees. In the urban area, you need a permit to injure or remove a tree 20 cm in diameter or larger, measured at 1.37 m. Digging footings near the roots counts as injury.
- Get a Zoning Clearance Certificate. The City requires an approved Zoning Clearance Certificate before any building permit application. The City's 2025 fee schedule listed a residential addition at $1,380.
- Apply for a minor variance if needed. If the design doesn't meet the zone rules, it goes to the Committee of Adjustment, which hears minor variance applications.
- Get grading approval and the building permit. The same pre-building form can include a grading and drainage certificate and a tree permit. The City issues the building permit after grading and drainage approval.
What we see on site
- Footings that don't match the drawings. Old house plans are often wrong or missing. Dig the test pit during design, not after the roof is off.
- Old wiring. Houses from the mid-60s and 70s can have aluminum branch wiring. Find it early, because the ESA inspection on the new work will flag it.
- Clay sewer laterals. Put a camera down a 60-year-old line before tying a new ensuite into it. Roots and cracked joints are common.
- Floor levels. People regret a rear addition that ends up one step down from the kitchen. We set the new floor height to match the existing floor.
- The house side of the budget. The addition is only part of the cost. New flooring that has to run through, patched ceilings and an opened-up kitchen add up. Budget for them from the start, or treat the job as a whole-home renovation in Burlington.
- Drainage. More roof and more hard surfaces mean more water. Downspouts and grading have to carry it away from both the new and the old foundation.
Which one we'd pick
| Your situation | What we'd usually build |
|---|---|
| Short 2 or more bedrooms, footings check out | Full second storey |
| Need a primary suite, want to keep the yard | Partial second storey |
| Enough bedrooms, cramped kitchen and living area | Rear family room with the kitchen opened up |
| Staying long term, stairs are a concern | Rear primary suite |
| Large lot, growing family, possible rental suite | Up and back, with the basement planned at the same time |
A good next step is our home additions in Burlington page. It shows how our one team handles design, the zoning clearance and every trade. Once you have a rough idea which way you want to go, book a consultation and bring your property survey if you have one.